CIVIL_SYSTEMS
Tools & Labs · Calculator

Time of Concentration Calculator

NRCS TR-55 velocity method · Reviewed November 2026 · Civil Systems LLC

Enter the flow path as sheet, shallow concentrated, and channel flow. Tc updates as you type.

in From NOAA Atlas 14. Used for sheet flow only.
01Sheet flowA thin sheet over the ground at the top of the path.
n
ft
ft/ft
02Shallow concentratedRills, gutters, and swales below the sheet flow.
Surface
ft
ft/ft
03Channel flowDefined ditches, streams, and pipes.
ft
ft/ft
n
Hydraulic radius
ft
Time of concentration
Time Length

Use as pre Tc ↗ Use as post Tc ↗ Opens the NRCS Hydrograph Calculator with this Tc.
Show the math
How it works

The velocity method in three segments

Tc is the time water takes to reach the outlet from the hydraulically most distant point. The NRCS velocity method follows that path, splits it where the flow changes character, and adds the travel time of each piece: Tc = ΣTt, with Tt = L / (3600 V) in hours.

01 · Sheet flow

Tt = 0.007 (nL)0.8 / (P20.5 s0.4)

Overton and Meadows’ kinematic solution of Manning’s equation, in hours. Water this shallow is slowed by grass and litter, so n is much larger than for a channel: 0.011 for pavement, 0.24 for dense grass, 0.80 for woods with dense underbrush.

This first 100 ft often takes as long as the next thousand. It is usually where Tc is won or lost.

02 · Shallow concentrated

V = 16.1345 √s unpaved · 20.3282 √s paved

After sheet flow, water gathers into rills, gutters, and swales. TR-55 gives the velocity from slope and surface alone (Figure 3-1), from Manning’s equation with fixed depths and roughness for each surface.

03 · Channel flow

V = (1.49 / n) R2/3 √s

Manning’s equation for defined channels and pipes, usually at bank-full flow. R is the flow area divided by the wetted perimeter. For a trapezoid, A = (b + zy)y and Pw = b + 2y√(1 + z²).

Limitations

When to be careful

This calculator reproduces TR-55 Example 3-1: 0.30 + 0.24 + 0.99 = 1.53 hr. Load it with the example button above.

Questions

Time of concentration FAQ

What is time of concentration?

Time of concentration (Tc) is the time runoff takes to travel from the hydraulically most distant point of a watershed to the outlet. It sets the rainfall intensity in the Rational Method and the timing of the peak in NRCS unit hydrographs, so a shorter Tc gives a higher peak flow.

How does the TR-55 velocity method calculate Tc?

It splits the flow path into sheet flow, shallow concentrated flow, and channel flow, finds the travel time of each segment, and adds them. Sheet flow uses the kinematic solution Tt = 0.007 (nL)0.8 / (P20.5 s0.4) in hours. Shallow concentrated flow uses V = 16.1345√s for unpaved ground or 20.3282√s for paved. Channel flow uses Manning’s equation. Each segment’s time is its length divided by 3,600 times its velocity.

Why does TR-55 limit sheet flow to 100 feet?

Sheet flow rarely stays as a thin uniform sheet for long before it gathers into rills and swales. The 1986 TR-55 allowed up to 300 ft, but the NRCS National Engineering Handbook Part 630, Chapter 15 (2010) and WinTR-55 limit sheet flow to 100 ft. Beyond that, treat the flow as shallow concentrated.

Where do I get the 2-year, 24-hour rainfall?

Use the NOAA Atlas 14 Precipitation Frequency Data Server for the site location and read the 2-year, 24-hour depth. Some agencies publish their own design rainfall tables; use those when they apply.

Is there a minimum time of concentration?

TR-55 uses a minimum Tc of 0.1 hour (6 minutes). Many local Rational Method criteria use a minimum of 5 to 10 minutes. Check the criteria of the agency reviewing the design.

Sources

References

  1. USDA Soil Conservation Service (1986). Urban Hydrology for Small Watersheds, Technical Release 55, 2nd ed., chapter 3 and Example 3-1.
  2. USDA NRCS (2010). National Engineering Handbook Part 630, Chapter 15, Time of Concentration. PDF
  3. Overton, D. E., and Meadows, M. E. (1976). Storm Water Modeling. Academic Press. (Sheet flow kinematic solution.)
  4. NOAA National Weather Service. Precipitation Frequency Data Server (Atlas 14).