CIVIL_SYSTEMS
Tools & Labs

Tools & Labs

Interactive teaching labs for engineering topics. Each one asks for a prediction, lets you change one input, and shows the calculation behind the result.

Lab
01

Urban Hydrology Lab

Guided experiments that connect stormwater equations to what water does on a site. Built for lecture, with a presentation view, and for self-study.

  • Runoff timing
  • Rational Method
  • Storm runoff
  • Detention
  • Travel time
Open lab ↗
Tool
01

NRCS Hydrograph Calculator

Runoff depth, peak flow, and a 24-hour Type II hydrograph for pre- and post-development conditions, with a first-cut detention storage estimate and a downloadable data table.

  • Curve number runoff
  • Peak flow
  • 24-hour hydrograph
  • Storage estimate
Open calculator ↗

Planned: Virginia stormwater applications, including the energy balance and the Virginia Runoff Reduction Method, once the core hydrology examples are verified against worked examples.