Workshop
Planning simulations and interactive engineering labs. Change an input, see what follows, and check the reasoning behind the result.
01
HexPlan
A regional planning simulation that turns long-range land-use choices into spatial scenarios across 25 years.
- Growth
- Preservation
- Investment
02
Communication Under Pressure
A negotiation simulation played by writing your own replies. Defend a disputed change order against an angry client and a one-hour clock.
- Negotiation
- Change orders
- Written replies
01
Urban Hydrology Lab
Guided experiments that connect stormwater equations to what water does on a site. Built for lecture, with a presentation view, and for self-study.
- Runoff timing
- Rational Method
- Storm runoff
- Detention
- Travel time
01
NRCS Hydrograph Calculator
Runoff depth, peak flow, and 24-hour Type II hydrographs for pre- and post-development conditions, with Tc sliders, 1-minute results, and a downloadable data table.
- Curve number runoff
- Peak flow
- 24-hour hydrograph
- Pre vs. post
02
Critical Path Method (CPM) Calculator
Run the forward and backward pass on an activity network. Change a duration and watch early dates, late dates, total float, free float, and the critical path update, with what-if questions, a step-by-step solution, and practice problems.
- Forward & backward pass
- Total vs. free float
- Critical path
- What-if questions
03
Monte Carlo Risk Calculator
Put ranges and risk events on a cost or schedule estimate, typed in or from an Excel template, and see the P50, the P80, the contingency it implies, and which lines drive the range. Includes a worked example and what-if questions.
- P10 to P90
- Contingency
- S-curve
- Tornado diagram
- Excel template
Planned: Virginia stormwater applications, including the energy balance and the Virginia Runoff Reduction Method, once the core hydrology examples are verified against worked examples.